He squeezed my shoulder and returned to stacking chairs.
When I reached home, I found a voicemail from Denise at the storage facility.
She said a man had attempted to enter unit B-17 using an old access code associated with Rebecca’s account.
The code no longer worked because Denise had disabled it after our earlier conversation.
The man claimed he was retrieving materials for an estate appraisal.
When Denise asked for identification, he left.
She had saved the security footage.
I thanked her and called Sarah.
She arranged for the storage unit to be moved under a new access agreement with additional verification requirements.
The next morning, we met Denise and inventoried the remaining files.
The folder marked Alternatives contained four purchase proposals addressed to Rebecca.
The first offered seventy-five thousand dollars for a limited easement.
The second offered one hundred and twenty thousand dollars for a permanent corridor.
The third proposed purchasing a strip of Rebecca’s backyard outright.
The fourth offered to buy the entire house for an amount that was substantially below its assessed value.
Each proposal came from a different company, but the contact information led back to the same office used by Westbridge.
Rebecca had written notes in the margins.
Beside the first offer, she wrote that the route would damage the old maple roots.
Beside the second, she questioned whether construction trucks could safely use the lane.
Beside the third, she wrote that the proposed boundary crossed land she did not own.
Beside the fourth, she wrote a sentence that made my throat tighten.
“They think I am too sick to understand what they are asking.”
I read the words twice before passing the page to Sarah.
She said the proposals might establish a history of negotiations, but their significance would depend on the surrounding communications.
Then she found a letter tucked behind the final offer.
It was written on stationery from the office of a regional engineering consultant.
The letter warned that the proposed drainage connection could alter runoff patterns during severe storms unless additional downstream capacity was constructed.
Rebecca had underlined a paragraph about flood risk to existing homes along Briar Glen Lane.
The engineer estimated that a direct connection without sufficient improvements could increase water levels in the lower section of the neighborhood during heavy rainfall.
That was where Arthur lived.
I suddenly understood why Rebecca had refused to treat the corridor as a private business transaction.
She had worried that a shortcut benefiting the development might shift risk onto neighbors who had no voice in the negotiations.