She did not want me wandering around looking for it.
I promised I would not.
Then she showed me a letter Peter had received from a developer years earlier.
The developer wanted to know whether the old conduit could be used for additional runoff from a proposed shopping center.
Peter had replied that the system required a comprehensive engineering study before anyone could rely on it for increased flow.
The shopping center was never built.
Caroline believed Westbridge had rediscovered the same shortcut.
I asked why Rebecca would have known about Peter’s notes.
Caroline said she had shown them to Rebecca after Lorraine began discussing the heritage corridor.
Rebecca had copied the relevant pages and promised to keep them safe.
I remembered seeing similar handwriting in the storage unit.
Caroline looked relieved when I told her the records were preserved.
Then she lowered her voice.
“Peter used to say the most dangerous thing about an old map is the confidence of somebody who hasn’t walked the ground,” she said.
I thought about the engineering report and the homes downhill from the proposed connection.
The dispute was not simply about who could cross a strip of land.
It was about what might happen after someone crossed it with machinery.
Sarah arranged for an independent civil engineer to review the available reports.
His name was Malcolm Price, and he had spent twenty-eight years evaluating municipal drainage projects.
He agreed to provide a preliminary assessment based on documents without entering disputed property.
We met at Sarah’s office on a rainy Thursday.
Malcolm spread the historic maps beside recent aerial photographs and traced the old conduit with a mechanical pencil.
He explained that the existence of a pipe did not establish its current capacity.
A conduit designed for orchard runoff might be inadequate for water collected from paved roads, parking lots, and rooftops.
He said the development could still be engineered responsibly, but it would require current measurements, inspections, and a design that accounted for downstream conditions.
The old report raised questions that could not be answered by a simple access agreement.
I asked whether the project could flood Arthur’s house.
Malcolm said he could not predict that without more data.
He could say that routing additional runoff toward a low-lying residential area deserved careful review.
Sarah asked him to prepare a written summary of the limitations in the available materials.
He agreed.
I left the meeting with a better understanding of what Rebecca had been trying to prevent.